Material to the factory
After we sign the contract with our customer, the customer pay the advance payment, we will purchase material, material in commonly 3 to 7 days or so can go to the factory.We purchase material according to the customer's requirements, there are black iron, galvanized sheet, stainless steel, etc., generally made of Q235, Q345, SS304, SS316, etc.

image2

Load material on the machine
The boss to arrange production plan, workshop staff to pack material to the above the machine for production.

image3

Cold bending forming
By cold bending forming die will products molding, have solar panel bracket,C strut channel, C, U, Z section steel, Angle steel,track, fence panels, deformed steel, adjusted the product size, the product of tolerance control within the standard, to ensure that meet the requirements.

image4

Cutting
Cold bending forming products, do you usually need to secondary cutting, The secondary cutting also called burr-free cutting.cutting into the required length according to customer requirements.Tolerance of + / - 3 mm.

ck

Punching holes/Slotted
Some products to facilitate the installation, need to punch.According to the customer request we open a good rushed piercing die hole.

image6

Surface treatment
Due to some products need to apply outside or in a specific environment, need to surface treatment products to enhance the corrosion resistance of the product.Generally have plastic spraying, hot-dip galvanized, cold galvanized/electric galvanized, etc.Coating thickness can be adjusted according to customer requirements.

bb

Packaging
After the completion of the production, we package according to customer requirements.With metal fixed, with plastic film, in order to prevent be affected with damp be affected with damp.For PV stent accessories with wooden packaging, some still need to use in cartons.

zz

Delivery
Finish goods generally in the customer after the balance we arrange delivery.The customer or we arrange the logistics or freight.